Traffic Impact Assessment (TIA)

Traffic Impact Assessment (TIA) in Johor

A Traffic Impact Assessment (TIA) studies how a proposed development will affect the surrounding road network, and sets out the measures needed to manage that impact. MASREKA CS prepares TIA reports for industrial and commercial projects across Johor, and supports submission to the Public Works Department (JKR) or the relevant local council.

Quick answer

When is a Traffic Impact Assessment (TIA) required in Johor?

A TIA is not required for every development. Under JKR’s national guideline (ATJ 38/2018), a TIA is typically required when the development reaches a published trigger level — for example about 150 added vehicles per hour in the commuter peak, 200 added vehicles per hour in the development’s off-peak generation peak, 200 residential dwelling units, or 45,000 sq ft of commercial gross floor area — or when the approving authority requires one even if those levels are not reached.

What this service is

A Traffic Impact Assessment, or TIA (Laporan Penilaian Lalulintas), is a technical study of the traffic a development is expected to generate, how that traffic will use nearby roads and junctions, and what improvements or management measures are needed so the impact remains acceptable. In Malaysia, the national reference for preparing a TIA is the Public Works Department (JKR) guideline Arahan Teknik Jalan (ATJ) 38/2018: Guidelines for Traffic Impact Assessment. Trip generation rates are typically taken from the Malaysian Trip Generation Manual, published by the Highway Planning Division of the Ministry of Works.

In Johor, a TIA is often required as supporting information for a Kebenaran Merancang (KM) / planning permission application. Planning checklists typically ask for a TIA that complies with JKR, the local authority, or both, where a TIA is needed.

When you need it

A TIA is not required for every development. Under the national JKR guideline, a TIA is typically required when any of the following trigger levels is reached, or when the approving authority requires one even if those levels are not reached:

  • About 150 added vehicles per hour (two-way) in the commuter peak;
  • About 200 added vehicles per hour (two-way) when the development’s peak falls in an off-peak period;
  • A residential development of 200 dwelling units; or
  • A commercial development of 45,000 sq ft gross floor area.

Local councils and JKR in Johor may apply these criteria, or may require a TIA in other cases, for example in a sensitive location. Confirm the current requirement with the approving authority for your site. MASREKA CS can help you check whether a TIA is typically needed before you apply for planning permission.

Typical process

  1. Confirm whether a TIA is required, based on the published trigger levels and any instruction from JKR or the local council.
  2. Define the study area and the junctions or road links to be assessed, in line with the guideline and any scoping comments from the approving authority.
  3. Collect existing traffic data, including traffic counts, and information on land use around the site.
  4. Forecast the development’s trips: generation, distribution, modal split and assignment, typically using rates from the Malaysian Trip Generation Manual.
  5. Analyse the impact of the added traffic on the study network, including operating conditions at key junctions.
  6. Propose mitigation measures for negative impacts, including measures that address the safety of all road users.
  7. Prepare the TIA report and submit it to JKR and/or the local authority, as required for the site.
  8. Respond to review comments. Once the TIA is approved, the approval letter and approved report are typically included with the KM / planning permission submission where a TIA is required.

Processing time depends on the size of the study, the traffic surveys, and the authority’s review. There is no single official period that applies to every TIA in Johor. Confirm the current expectation with the relevant authority.

Documents typically required

To start a TIA, the following are typically needed. The approving authority may ask for further items:

  • Site location plan and key plan;
  • Proposed layout and development schedule, including land use, gross floor area or unit count, and access points;
  • Any existing approved layout or planning permission plans;
  • Information on the surrounding road network and nearby committed developments, where known;
  • Traffic counts and other survey data, which are usually collected as part of the study; and
  • Any scoping comments already issued by JKR or the local council.

How MASREKA CS helps

MASREKA CS prepares Traffic Impact Assessment reports for industrial and commercial projects across Johor, in line with current JKR guidelines, and supports submission to JKR or the local council. The firm can:

  • Advise whether a TIA is typically required for your proposal;
  • Define the study scope, arrange traffic surveys, and prepare the TIA report;
  • Propose practical mitigation measures that can be coordinated with the civil design;
  • Submit the report to the approving authority and respond to review comments; and
  • Coordinate the TIA with your KM / planning permission and other authority submissions.

Fees depend on the study scope and the surveys required. Contact the firm for a quotation. MASREKA CS does not guarantee approval or a fixed review period; those decisions rest with the approving authority.

At a Glance

  • Since 2021Incorporated in Malaysia, SSM 202101000182
  • 10 engineering servicesC&S, roads, drainage, TIA, Bomba, KM and more
  • Industries servedResidential, commercial, industrial and infrastructure
  • Real project recordsSite photos and videos →

Key facts

ItemDetails
ServiceTraffic Impact Assessment (TIA) in Johor
ProviderMASREKA CS SDN. BHD. (SSM 202101000182), Taman Johor Jaya, Johor Bahru, incorporated in 2021
Areas servedJohor Bahru, Iskandar Puteri, Pasir Gudang, Kulai, Skudai and across Johor
Who it is forProperty developers, architects, main contractors, project managers, industrial clients, asset owners and private landowners
FeesNo fixed price. Fees depend on project type, size, location, design stage and scope; a quotation is given after the scope is reviewed. Request a quote.
LanguagesEnglish and Chinese
Office hoursMonday to Friday, 9:00 am to 5:30 pm
How to startWhatsApp +6012-711 3638, call 07-287 6968, or email masrekacs2020@gmail.com with the site location, project type, stage and any drawings.

Talk to an engineer

Use the contact form, WhatsApp +6012-711 3638, or call the office on 07-287 6968. MASREKA CS SDN. BHD., No. 17, Jalan Ros Merah 2/5, Taman Johor Jaya, 81100 Johor Bahru, Johor.

Request a consultation WhatsApp +6012-711 3638

Related pages

Frequently asked questions

When is a Traffic Impact Assessment (TIA) required in Johor?

A TIA is not required for every development. Under JKR’s national guideline (ATJ 38/2018), a TIA is typically required when the development reaches a published trigger level — for example about 150 added vehicles per hour in the commuter peak, 200 added vehicles per hour in the development’s off-peak generation peak, 200 residential dwelling units, or 45,000 sq ft of commercial gross floor area — or when the approving authority requires one even if those levels are not reached. In Johor, the TIA must typically comply with JKR and/or the relevant local council. Confirm the current requirement with the authority for your site.

What does a TIA report typically include?

A TIA typically defines the study area, records existing traffic patterns, describes nearby land use, forecasts trips (generation, distribution, modal split and assignment), analyses the impact of the added traffic, and proposes mitigation measures for negative impacts, including road-user safety. Trip generation rates are typically taken from the Malaysian Trip Generation Manual published by the Highway Planning Division of the Ministry of Works.

Who approves a TIA in Johor — JKR or the local council?

It depends on the site and the council’s requirements. Johor planning checklists typically require the TIA to comply with JKR or the local authority (PBT), or both. The approved TIA report, or a TIA approval letter together with the approved report, is often submitted in support of a Kebenaran Merancang (KM) / planning permission application. MASREKA CS can advise which approving authority typically applies and prepare the submission accordingly.

How long does a TIA take to complete and approve?

The time needed depends on the size of the study area, how long traffic surveys take, the completeness of the development data, and how quickly the approving authority comments. There is no single official period that applies to every TIA in Johor. MASREKA CS cannot control the authority’s review time, but it prepares a complete report and responds to comments so the study is not delayed on the consultant’s side.

Can a TIA be submitted after planning permission (KM)?

A TIA, where required, is typically needed in support of the Kebenaran Merancang (KM) / planning permission application, not after it. Some Johor checklists ask for the TIA report, or a TIA approval letter and the approved report from JKR or the local council, as part of the planning submission. Starting the TIA early avoids holding up the KM application. Confirm the current sequence with the relevant council.

What information is needed to start a TIA?

Typically: a site location or key plan, the proposed layout and development schedule (land use, floor area or unit count, and access points), any existing approved plans, and information on the surrounding road network. Traffic counts and other surveys are usually carried out as part of the study. If the approving authority has already given scoping comments, those should be included.