What this service is
Kebenaran Merancang (KM), or planning permission, is the local planning authority’s formal consent for a proposed development. Under section 21 of the Town and Country Planning Act 1976 (Act 172), a person who proposes to develop land applies to the local planning authority, in the prescribed form, with the prescribed plans, documents and fees. If the applicant is not the landowner, the landowner’s written consent is typically required.
In Johor, KM applications are typically registered on the national OSC 3.0 Plus portal for the relevant council. A Development Proposal Report (Laporan Cadangan Pemajuan, LCP) and planning permission plans form the core of the submission, together with technical reports required by the checklist — which may include a Traffic Impact Assessment (TIA) where one is needed.
When you need it
You typically need KM before carrying out development that involves a new building, a material change of use, subdivision or amalgamation, a new layout, or certain alterations and additions, as determined by the local planning authority and the Johor planning rules, including the Planning Control (General) Rules. Some councils, such as Majlis Bandaraya Pasir Gudang (MBPG), also provide a pre-consultation form for KM.
Building-plan and Bomba (JBPM) submissions typically follow KM approval at the same council. Confirm whether your proposal requires KM with the authority for your site, or with MASREKA CS.
Typical process
- Identify the correct local planning authority for the site — typically Majlis Bandaraya Johor Bahru (MBJB), Majlis Bandaraya Iskandar Puteri (MBIP), Majlis Bandaraya Pasir Gudang (MBPG), Majlis Perbandaran Kulai (MPKu), or another Johor district or municipal council — and the type of KM application (for example layout, building, amendment or extension of time).
- Gather land title, tax receipts and other owner documents, and confirm any need for landowner consent, bank consent or a power of attorney.
- Prepare the key plan, location plan and planning permission / layout plans, and the Development Proposal Report (LCP).
- Prepare or coordinate supporting technical reports required by the council checklist, such as a TIA, stormwater (MSMA) calculations, sewerage, electrical load, geology or an environmental report, where applicable.
- Register the application on OSC 3.0 Plus, upload the documents in the required format (typically PDF), and pay the council fees within the period stated on the portal. Some Johor OSC portals state that payment must be made within seven working days of the application, or the application may be terminated. Follow the period shown for your council.
- The OSC unit typically checks the online application within seven days and, if the file is complete, asks the applicant to submit hard copies and settle payment before circulating the application to the technical agencies.
- Respond to written directions and plan amendments, and follow the application through the OSC committee process until an official decision is issued.
Processing time varies by council, the scale of the application, whether the documents are complete, and whether written directions need to be answered. Councils publish target processing periods under the OSC 3.0 Plus manual; these typically differ for small, medium and large applications. Actual time can be shorter or longer than the published target. Confirm the current period with the council for your site. Application fees are set by the local planning authority. MASREKA CS does not guarantee approval or a fixed review period.
Documents typically required
OSC 3.0 Plus checklists for Johor councils typically include the following core documents. The exact list depends on the council and the type and scale of the application, and should be confirmed before you apply:
- KPPA Form A (Borang A) and an official application letter;
- Key plan, location plan and planning permission / layout plan;
- Fee calculation and payment receipt;
- Land title, or a sale-and-purchase agreement, bank consent or official search, as applicable;
- Right-of-way or access consent, where the proposed access is not on the applicant’s title or involves a highway reserve;
- Land survey plan and contour plan;
- Development Proposal Report (Laporan Cadangan Pemajuan, LCP);
- Current assessment tax receipt and land tax receipt;
- Company registration or landowner identification documents, and a power of attorney where a representative signs; and
- Recent site photographs.
Supporting technical reports are included where the checklist requires them. These may include a TIA approval, a stormwater management report, a sewerage engineering report, an estimated electrical load, a geological or slope report, an environmental approval, or other agency documents listed by the council.
How MASREKA CS helps
MASREKA CS prepares the civil and structural drawings and supporting engineering documents for Kebenaran Merancang (KM) submissions on industrial and commercial projects across Johor, and assists clients through the OSC process. The firm can:
- Help identify the correct council and the type of KM application;
- Prepare and endorse civil and structural drawings that form part of the planning permission plans;
- Coordinate supporting engineering reports, including a TIA where one is required;
- Assemble OSC 3.0 Plus documentation to the current council checklist; and
- Prepare responses to written directions and support resubmission until the application is ready for a decision.
This work sits alongside the firm’s authority submission service and, after KM, the building-plan and Bomba submissions. Fees depend on the project scope; contact the firm for a quotation.
At a Glance
- Since 2021Incorporated in Malaysia, SSM 202101000182
- 10 engineering servicesC&S, roads, drainage, TIA, Bomba, KM and more
- Industries servedResidential, commercial, industrial and infrastructure
- Real project recordsSite photos and videos →
Key facts
| Item | Details |
|---|---|
| Service | Kebenaran Merancang (KM) / Planning Permission in Johor |
| Provider | MASREKA CS SDN. BHD. (SSM 202101000182), Taman Johor Jaya, Johor Bahru, incorporated in 2021 |
| Areas served | Johor Bahru, Iskandar Puteri, Pasir Gudang, Kulai, Skudai and across Johor |
| Who it is for | Property developers, architects, main contractors, project managers, industrial clients, asset owners and private landowners |
| Fees | No fixed price. Fees depend on project type, size, location, design stage and scope; a quotation is given after the scope is reviewed. Request a quote. |
| Languages | English and Chinese |
| Office hours | Monday to Friday, 9:00 am to 5:30 pm |
| How to start | WhatsApp +6012-711 3638, call 07-287 6968, or email masrekacs2020@gmail.com with the site location, project type, stage and any drawings. |
Talk to an engineer
Use the contact form, WhatsApp +6012-711 3638, or call the office on 07-287 6968. MASREKA CS SDN. BHD., No. 17, Jalan Ros Merah 2/5, Taman Johor Jaya, 81100 Johor Bahru, Johor.
Related pages
Frequently asked questions
What is Kebenaran Merancang (KM) / planning permission?
Kebenaran Merancang (KM) is planning permission under the Town and Country Planning Act 1976 (Act 172). In general, a person who proposes to develop land must apply to the local planning authority for planning permission. In Johor this is typically submitted through the council’s One Stop Centre (OSC) using the OSC 3.0 Plus portal, with plans, a Development Proposal Report (Laporan Cadangan Pemajuan, LCP) and the supporting documents listed on the council checklist.