What this service is
A Bomba (JBPM) submission is the application for the Fire and Rescue Department to review and certify the fire-safety provisions of a building. It typically covers the architectural fire plans and, where required, the mechanical and electrical (M&E) fire-protection plans. The legal basis for many of the technical requirements is the Uniform Building By-Laws 1984 (UBBL) and the local authority’s current JBPM checklist.
JBPM states that applications for certification of building plans and M&E fire plans should be made through the One Stop Centre (OSC) of the local authority where the project is built. The OSC then circulates the plans to JBPM. In Johor, applications are typically registered on the national OSC 3.0 Plus portal for the relevant council, such as MBJB, MBIP, MBPG or MPKu.
When you need it
Most new buildings, and many extensions, alterations or changes of use, require fire-safety plans to be reviewed by JBPM as part of the building-plan process. The exact requirement depends on the building type, occupancy and the council’s checklist. Cosmetic interior work that does not affect fire safety may follow a different process.
Building-plan and Bomba submissions typically follow Kebenaran Merancang (KM) / planning permission. A later, separate step is the JBPM inspection and clearance letter associated with the Certificate of Completion and Compliance (CCC). Confirm the current requirement for your building with the relevant council or with MASREKA CS.
Typical process
- Confirm the fire-safety scope with the design team (architect, civil and structural engineer, and M&E consultant as required) and with the council’s current JBPM checklist.
- Register the application on OSC 3.0 Plus for the local authority where the project is built, and upload the required documents, typically in PDF.
- Prepare the fire plans and calculations to JBPM and UBBL requirements, including the items listed on the council checklist.
- Submit hard copies at the OSC counter when the OSC unit asks for them, together with any fees set by the council or the department.
- The OSC circulates the plans to JBPM according to the processing category for the application.
- JBPM typically comments and then issues a clearance letter (surat pelepasan) to the local authority. The department states that it typically comments within seven days of receiving the application from the local authority. Actual timing can vary; confirm the current practice with the relevant OSC.
- Respond to comments and resubmit if required, until the plans are cleared.
- At a later stage, apply through the OSC for JBPM inspection in connection with CCC clearance, with the fire-safety inspection checklist and the inspection fee. JBPM states that inspection is typically carried out within seven days after clearance letters from Tenaga Nasional Berhad (TNB) and the water authority are issued, and that the clearance letter is typically issued on the day of inspection.
Fees for plan review and inspection are set by the relevant authority. Contact the council, JBPM or MASREKA CS for current fee advice. MASREKA CS does not guarantee approval or a fixed review period.
Documents typically required
Council checklists for a JBPM plan submission typically include the following. The exact list is set by the relevant OSC and should be confirmed before you apply:
- An official application letter to JBPM;
- Complete architectural or fire plans, typically at A1 size, with fire-safety requirements noted on each sheet;
- Occupancy-load and exit-capacity calculations;
- Fire-appliance access, typically marked (often in yellow) and based on the building volume;
- Hydrant locations, typically not more than 91.5 m apart, and typically marked in red;
- Unprotected-area calculations under the Sixth Schedule of the Uniform Building By-Laws 1984, where applicable;
- Active and passive fire-safety installations marked on the plans (typically in red);
- The certification, signature and official stamp of the qualified person on every sheet; and
- An e-Premis Bomba registration slip, where the council checklist requires it.
How MASREKA CS helps
MASREKA CS prepares and coordinates Bomba (JBPM) submissions for industrial and commercial projects across Johor. The firm can:
- Review the council’s current JBPM checklist and advise what is typically required for your building;
- Prepare the engineering drawings and supporting calculations that form part of the fire-safety submission;
- Coordinate the package with the project architect and M&E consultant, including architectural fire layout and M&E fire-protection system design as required;
- Assemble the OSC 3.0 Plus documentation and assist with circulation through the local OSC; and
- Prepare written responses to JBPM review comments and support resubmission until the plans are ready for clearance.
This work sits alongside MASREKA CS’s civil and structural engineering and authority submission services. Fees depend on the project scope; contact the firm for a quotation.
At a Glance
- Since 2021Incorporated in Malaysia, SSM 202101000182
- 10 engineering servicesC&S, roads, drainage, TIA, Bomba, KM and more
- Industries servedResidential, commercial, industrial and infrastructure
- Real project recordsSite photos and videos →
Key facts
| Item | Details |
|---|---|
| Service | Bomba (Fire Department / JBPM) Submission in Johor |
| Provider | MASREKA CS SDN. BHD. (SSM 202101000182), Taman Johor Jaya, Johor Bahru, incorporated in 2021 |
| Areas served | Johor Bahru, Iskandar Puteri, Pasir Gudang, Kulai, Skudai and across Johor |
| Who it is for | Property developers, architects, main contractors, project managers, industrial clients, asset owners and private landowners |
| Fees | No fixed price. Fees depend on project type, size, location, design stage and scope; a quotation is given after the scope is reviewed. Request a quote. |
| Languages | English and Chinese |
| Office hours | Monday to Friday, 9:00 am to 5:30 pm |
| How to start | WhatsApp +6012-711 3638, call 07-287 6968, or email masrekacs2020@gmail.com with the site location, project type, stage and any drawings. |
Talk to an engineer
Use the contact form, WhatsApp +6012-711 3638, or call the office on 07-287 6968. MASREKA CS SDN. BHD., No. 17, Jalan Ros Merah 2/5, Taman Johor Jaya, 81100 Johor Bahru, Johor.
Related pages
Frequently asked questions
Do I need a Bomba (JBPM) submission for my project in Johor?
Most new buildings, and many extensions or changes of use, require fire-safety plans to be reviewed by the Fire and Rescue Department of Malaysia (JBPM, commonly called Bomba) as part of the building-plan process. The exact requirement depends on the building type and the local authority’s checklist. Cosmetic interior work that does not affect fire safety may follow a different process. Confirm the current requirement with the relevant council or with MASREKA CS.